LÏEF Development
SABS Bid TrackerLÏEF Development · Internal

Per-Bid-Type Section Spec

Bid Recipes

6 recipes defining which sections, checklists, and appendices appear for each bid type. Every new bid selects a recipe and gets the right sections auto-populated.

COMMERCIAL · COMMERCIAL_INTERIOR
Commercial Drywall Only (Interior)
COMMERCIAL_DRYWALL_ONLY
Com
Scope: DRYWALL_ONLY
Required Sections (17)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+7
Checklist Items (6)
  • Wall type schedule confirmed
  • GWB sheet count takeoff complete
  • Fire-rated wall LF count
  • Ceiling scope (ACT vs. hard lid vs. mixed)
  • +2 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps
COMMERCIAL · HOTEL
Commercial Hotel / Multifamily
COMMERCIAL_HOTEL
Com
Scope: FULL_PROJECT
Required Sections (18)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+8
Checklist Items (10)
  • Brand approval status (Hyatt/Marriott/etc.)
  • STR performance data for market pulled
  • Phase I/II environmental report
  • Geotech report
  • +6 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps
COMMERCIAL · RESTAURANT
Commercial Restaurant
COMMERCIAL_RESTAURANT
Com
Scope: FULL_PROJECT
Required Sections (18)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+8
Checklist Items (7)
  • Franchise brand spec kit referenced
  • Kitchen equipment source (owner-direct vs. GC)
  • Grease trap / FOG requirements
  • Drive-thru scope (order board, canopy, etc.)
  • +3 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps
RESIDENTIAL · ADU
Residential ADU
RESIDENTIAL_ADU
Res
Scope: FULL_PROJECT
Required Sections (18)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+8
Checklist Items (8)
  • Lot dimensions field-verified
  • Utility tie-in locations confirmed (water/sewer/gas/electric)
  • Soil conditions visually assessed / geotech needed?
  • Existing structure demo scope confirmed with owner
  • +4 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps
RESIDENTIAL · SFR
Residential Luxury SFR
RESIDENTIAL_LUXURY
Res
Scope: FULL_PROJECT
Required Sections (19)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+9
Checklist Items (8)
  • Architect design intent alignment meeting held
  • Custom cabinetry/millwork scope defined
  • Appliance package selected
  • Stone veneer selection finalized
  • +4 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps
RESIDENTIAL · SFR
Residential SFR (Single Family Residence)
RESIDENTIAL_SFR
Res
Scope: FULL_PROJECT
Required Sections (18)
coverproject factsproject educationpartner structurebid totalscope inscope outthird party tradescost breakdownkey assumptions+8
Checklist Items (8)
  • Topographic survey available / needed
  • Geotech report available / needed
  • Hillside / retaining wall scope defined
  • Existing home demo scope confirmed
  • +4 more…
Appendices
aerialtakeoffmarket datastreet viewproperty photoscompetitor comps