SABS Bid
Palis-Oballa Residence
9331 S Krista Dr
Latest Bid
—
Square Footage
—
Units
1
Scope Class
SABS + Trades
Estimate SLA
Project Lifecycle
Project Brief
Full custom home at 9331 S Krista Dr, Glendale AZ. 27-sheet sealed set dated 05-28-25. Client = Palis-Oballa Family; owner acts as GC/PM (family member met 3pm 2026-01-22). Architect/engineer: Badilla & Associates (Consulting Engineers).
Work Scope
LÏEF is self-performing SABS framing and SABScrete application on a full custom home at 9331 S Krista Dr, Glendale. Scope was originally scoped as a cabana only but has been expanded post-meeting to the entire residence (27-sheet sealed set from Badilla & Associates, dated 05-28-25). Owner acts as their own GC/PM, so LÏEF is SABS-only — walls, slab screw, SABScrete — with all other trades carried by the family GC. Preliminary range $346K–$483K, hard bid sequenced after the SABS training week at 301 Osborn.
Scope Summary
SABS framing and application — ENTIRE HOUSE (originally scoped as cabana only; expanded to full residence post-meeting).
Internal Notes
Client name: Palis-Oballa Family (per project summary PDFs). Female GC/PM is a family member (name not in files). Architect/engineer: Badilla & Associates. Preliminary range $346K-$483K (rough). Bid sequence: after SABS training week at 301 Osborn. Source: Palis-Oballa/palis-oballa-full-residence-summary.pdf, STRATA-palis-oballa-cabana-project-summary.pdf (PDF extraction 2026-04-14). Strata-Pipeline-Audit-2026-04-10.md row 4.
Bid Versions
No bid versions logged yet.