SABS Bid
SMR Partnership Proposal
Latest Bid
—
Square Footage
—
Units
—
Scope Class
Other
Estimate SLA
Project Lifecycle
Project Brief
SMR (Silver Mountain Ranches) partnership proposal — PDF and .pages file at root of [CW] Strata/.
Work Scope
Lost / passed. SMR (Silver Mountain Ranches) was a partnership proposal rather than a hard bid. Had it moved forward, LÏEF's role would have been as SABS builder / developer partner across the SMR pipeline — self-performing SABS wall-system install (LÏEF Blocks, slab screw, SABScrete) on ranch residences and outbuildings, with LÏEF optionally acting as owner's rep/GC on larger phases. No plan set or bid deliverables produced beyond the proposal document.
Scope Summary
Silver Mountain Ranches partnership proposal — passed/lost.
Internal Notes
Loss category: SMR. Files at root: 'SMR Partnership Proposal.pdf' (Oct 30 2025), 'SMR Proposal .pages'. Nothing else in files indicates outcome — marking LOST per user task instruction options. Source: Root [CW] Strata/ file listing (Oct 30 2025 mtimes). User task instruction (loss_category=SMR, status=LOST or PASSED).
Bid Versions
No bid versions logged yet.